Vision to Blueprint
in 30 Minutes.
How we architected an Enterprise Recruiting Copilot with 25% faster delivery and $88K estimated ROI.
Time Saved
43d
ROI
$88K
Tasks Built
324

Solving Recruiting
at Enterprise Scale
Mid-market leaders hiring 500+ people annually face a critical bottleneck: candidate noise. fragmentation across LinkedIn, GitHub, and proprietary boards leads to hundreds of lost engineering hours.
The mission was to build a system that moves beyond keywords. Using FLOWiGANTT, we architected an Explainable AI engine that weights real-world contributions—commits, technical blogs, and conference impact—into a unified score.
CTO Executive Snapshot
Architecture complexity analysis
23 Architecture Epics
Full-stack infrastructure covering multi-worker scrapers and secure GDPR vaults.
324 Engineering Tasks
Granular Node.js, Next.js, and ML pipeline tasks ready for immediate sprint start.
$88,000 Saved ROI
Calculated efficiency gains from AI-native technical architecture mapping.
How We Calculate
Strategic Value
ROI isn't just a number—it's the tangible result of eliminating manual overhead and technical misalignment during the most critical phase of your project.
Time Saved
Planning to Sprint Zero
The Formula
Estimated Cost Saving
Based on $2,040/day team burn
Architectural
Acceleration
Why teams choose FLOWiGANTT over manual planning. We don't just generate tasks; we synthesize technical context into a buildable reality.
Deep Context Synthesis
Unlike generic LLMs, our engine maps infrastructure, security, and product requirements into a unified 3D graph before generating any task.
Instant Document Parity
PRDs, Architecture Docs, and Jira Tasks are generated simultaneously, ensuring 100% alignment across the entire document suite.
Production-Ready Logic
Tasks include technical implementation details, recommended AI tools, and dependency-aware critical path calculations.
From "Idea" to "Code-Ready"
in 30 Minutes.
Technical Validation
Architecture Evidence
Every pixel of this blueprint was generated by the FLOWiGANTT engine, ready for engineering implementation.

Evidence: Strategic Roadmap
Strategic Roadmap
Phase-based development timeline

Evidence: Core Architecture
Core Architecture
Microservices & Data Logic

Evidence: PRD Specs
PRD Specs
Detailed product requirements

Evidence: Interactive Gantt
Interactive Gantt
Task-level dependency mapping
Production Assets
The Document Suite
Actual technical documentation exported from the FLOWiGANTT engine.

Product (PRD)
Executive summaries, compliance mapping, and core feature specifications.

Technical Design
Architecture diagrams, schema definitions, and API specifications.

Idea Evaluation
Strategic feasibility, market alignment, and technical viability reports.

Dev Roadmap
User story mapping, task logic, and dependency-aware exports.
Stop Guessing.
Start Planning.
Turn your complex enterprise vision into a build-ready engineering roadmap in under 30 minutes.